[2017 Cisco Dumps Video] Get Actual CCNA Data Center DCICT 200-155 Dumps PDF Exam Answers Are Based On The Real Exam Video Training

Are there any practice exams for Cisco 200-155 dumps? “Introducing Cisco Data Center Technologies” is the name of Cisco 200-155 exam dumps which covers all the knowledge points of the real Cisco exam. Get actual CCNA Data Center DCICT 200-155 dumps pdf exam answers are based on the real exam video training. Pass4itsure Cisco 200-155 dumps exam questions answers are updated (85 Q&As) are verified by experts. The associated certifications of 200-155 dumps is CCNA Data Center.

This https://www.pass4itsure.com/200-155.html dumps exam tests a candidate’s knowledge of fundamental data center technologies including unified computing, data center network virtualization, Cisco data center networking technologies, data center automation and orchestration, and Application Centric Infrastructure. The course, Introducing Cisco Data Center Technologies v6 (DCICT), will help candidates prepare for this exam, as the content is aligned with the exam topics.

Exam Code: 200-155
Exam Name: Introducing Cisco Data Center Technologies
Q&As: 85

[2017 Cisco 200-155 Dumps Video From Google Drive]: https://drive.google.com/open?id=0BwxjZr-ZDwwWNHFtR0VqbXVEeUU

[2017 Cisco 210-260 Dumps Video From Google Drive]: https://drive.google.com/open?id=0BwxjZr-ZDwwWU0xad3NvRWR4Qzg

200-155 Dumps

Following Cisco 200-155 Dumps 85QAs Are All New Published By Pass4itsure:

QUESTION: 148
The project manager calculated a schedule performance index of 0.8 and a cost performance index of 1.1 for the project. What is the actual status of this project?
A. Behind schedule and over budget
B. Behind schedule and under budget
C. Ahead of schedule and under budget
D. Ahead of schedule and over budget
200-155 exam Answer: B
QUESTION: 149
EAC (estimate at complete) is typically based on actual cost (AC) for work completed plus an ETC (estimate to complete) the remaining work. Which of the following is a valid formula for calculating EAC?
A. EAC = AC + [(BAC-EV) / (Cumulative CPI * Cumulative SPI)]
B. EAC = BAC – AC

C. EAC = 1 – CPI
D. EAC = EV + [1 – (Cumulative CPI * Cumulative SPI) / BAC]
Answer: A
QUESTION: 150
Which of the following equations is used to calculate schedule variance?
A. EV/PV
B. PV/EV
C. EV-PV
D. PV-EV
200-155 dumps Answer: C
QUESTION: 151
Which tool and technique uses a statistical relationship between historical data and other variables to calculate estimates?
A. Analogous estimating
B. Three-point estimates
C. Parametric estimating
D. Bottom-up estimating
Answer: C
QUESTION: 152
Which of the following equations is used to calculate cost variance?
A. EV-AC
B. AC-EV
C. AC+EV
D. AC/EV
200-155 pdf Answer: A
QUESTION: 153
Given the following values, what is the calculated expected activity cost (CE) when using PERT?
CO = $7,000
CM = $10,500
CP = $11,000
A. $ 4,750
B. $ 9,500
C. $10,000
D. $11,500
Answer: C
QUESTION: 154
What is the expected activity cost for a project having a most likely cost of $140, a best case scenario of $115, and a worst case scenario of $165?
A. $115
B. $138
C. $140
D. $165
200-155 vce Answer: C
QUESTION: 155
What does a SPI value greater than 1.0 indicate?
A. More work was completed than planned
B. Less work was completed than planned
C. Cost overrun for completed work has occurred
D. Cost underrun for completed work has occurred
Answer: A
QUESTION: 156
Total funding requirements and periodic funding requirements are derived from:
A. funding limit reconciliation
B. scope baseline
C. activity cost estimates.
D. cost baseline.
200-155 exam Answer: D
QUESTION: 157
What is the status of the project whose data is shown in the following S-curve?
A. Under budget and ahead of schedule
B. Over budget and behind schedule
C. Over budget and ahead of schedule
D. Under budget and behind schedule
Answer: B
QUESTION: 158
If the earned value (EV) is $1000, actual cost (AC) is $800, and planned value (PV) is $1500, what would be the cost performance index (CPI)?
A. 0.66
B. 0.8
C. 1.25
D. 1.5
200-155 dumps Answer: C
QUESTION: 159
Control Charts, Flowcharting, Histograms, Pareto Charts, Scatter Diagrams are tools and techniques of what process?
A. Perform Quality Control
B. Perform Quality Assurance

C. Quality Planning
D. Performance Reporting
Answer: A
QUESTION: 160
Which tool and technique identifies inefficient and ineffective policies, processes and
procedures?
A. Scope audits
B. Scope reviews
C. Quality audits
D. Control chart
200-155 pdf Answer: C
QUESTION: 161
What quality control tool graphically represents how various elements of a system interrelate?
A. Control chart
B. Flowchart
C. Run chart
D. Pareto chart
Answer: B
QUESTION: 162
Which tool and technique of quality planning involves comparing actual or planned practices to those of other projects to generate ideas for improvement and provide a basis by which to measure performance?
A. Histogram
B. Quality audits
C. Benchmarking
D. Performance measurement analysis

200-155 vce Answer: C
QUESTION: 163
In which domain of project management would a Pareto chart provide useful information?
A. Scope Management
B. Time Management
C. Communications Management
D. Quality Management
Answer: D
QUESTION: 164
What is the primary benefit of meeting quality requirements?
A. Quality metrics
B. Less rework
C. Quality control measurements
D. Benchmarking
200-155 exam Answer: B
QUESTION: 165
What is the name of the statistical method that helps identify which factors may influence
specific variables of a product or process under development or in production?
A. Failure modes and effects analysis
B. Design of experiments
C. Quality checklist
D. Risk analysis
Answer: B
QUESTION: 166
What is the term assigned to products or services having the same functional use but different technical characteristics?

A. Scope
B. Quality
C. Specification
D. Grade
200-155 dumps Answer: D
QUESTION: 167
Which of the following provides a basis for assessing project performance?
A. Profitability and impact matrix
B. Expert judgment
C. Benchmarking
D. Risk categorization
Answer: C
QUESTION: 168
Regardless of style, what information is shown in a process flowchart?
A. Actions, decision points, and process drivers
B. Activities, decision points, and the order of processing
C. Activities, process drivers, and the order of processing
D. Actions, decision points, and activities
200-155 pdf Answer: B
QUESTION: 169
Which quality assurance tool and technique confirms the implementation of approved change requests, corrective actions, defect repairs, and preventive actions?
A. Quality checklists
B. Quality metrics
C. Quality audits
D. Process analysis

Answer: C
QUESTION: 170
Which tool or technique uses the 80/20 principle?
A. Pareto chart
B. Cause and effect diagrams
C. Control charts
D. Flowcharting
200-155 vce Answer: A
QUESTION: 171
What is a cost of nonconformance?
A. Rework
B. Inspections
C. Training
D. Testing
Answer: A
QUESTION: 172
What is included in a control chart?
A. Baseline
B. Planned value
C. Upper specification limit
D. Expenditure
200-155 exam Answer: C
QUESTION: 173
What tool and technique includes all costs incurred over the life of a product by investment in preventing nonconformance to requirements?
A. Cost of quality
B. Measure of design
C. Statistical control
D. Systematic analysis
Answer: A
QUESTION: 174
In a control chart, the consecutive measurements are 11, 13, 09, 07, 08, 09, 09, 09, 08, and 12. For the entire process, the goal is 10 and the standard deviation is 1. For this data set, it is correct to say that the process:
A. is under control.
B. is out of control.
C. has an increasing trend.
D. has a decreasing trend.
200-155 dumps Answer: B
QUESTION: 175
In which tool and technique is it possible to find a correlation between dependent and
independent variables?
A. Fishbone diagram
B. Control chart
C. Run chart
D. Scatter diagram
Answer: D
QUESTION: 176
A project manager arranges for project specific training for the new team members. Under
which category does this cost fall?

A. Appraisal
B. Internal failure
C. External failure
D. Prevention
200-155 pdf Answer: D

200-155 Dumps

This is the reason why so many CCNA Data Center professionals have been using our Cisco 200-155 dumps questions and answers, as they are well aware of the fact that we have always been offering the right kind of Cisco 200-155 exam, dumps that can be the best help for them to prepare for their https://www.pass4itsure.com/200-155.html dumps pdf exams the way they want whenever they like to appear.